This site uses cookies for its functions. By continuing to browse the site, you agree to allow cookies to be set on your computer.
OK More Information✖
The detailed budget is currently being prepared but preliminary estimates are that operating costs will rise to $3,500,000 ($5,250,000 with 50% overhead) and that about $20,000,000 will eventually be required for buildings and equipment.
0 4 2.
Engineering Enrollments .(1979) Canada B.C.
Undergraduate 30,716 1,456 (4.7%) Graduate 4,894 194 (3.96%) These data indicate enrollments at about half of the level that would be expected on the basis of total population.
per 1000 of Population (20-24) .
772.0 746.8 B.C. Employment of Engineers as a Percentage of Canadian Total (1978) 100% 9.4% Professional Engineers, Registered in 1979 101,227 9,556 (9.4%) 4. Immigration Canada B.C. Landed ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf