  • . —.. : :-. -;' . •'' "-• -2y' '.L — - •f 4 1. - .a'"r -. The design study has shown that construction will cost $19,000,000. Of these costs $4,000,000 are for a building, $8,000,000 for the accelerator and control system and $7,000,000 for the beam transport system, moveable shielding and other items associated with the experimental area. The project would require about $3,000,000 in annual operating costs after completion.